Well, the workers did not finish tiling the floors. Looks like they can finish tomorrow. Now, the workers did something really odd, instead of mixing the cement outside with water, they decided to do it INSIDE my house in my kitchen bathroom. Now the entire first floor is layered in cement dust, the kitchen floor is muddy, the kitchen bathroom is a disaster. God I hope they finish tomorrow.
(Tiling my first floor)
(They called it quits after this)
Now I can get my motorbike out. I let my cat back inside the house (Lucky is still outside). He has gotten his paw prints all over the wet cement already (^_^).